Cross-references declared production with satellite-estimated extraction, export manifests, and EITI filings to surface revenue at risk.
| Code | Holder | FY $ |
|---|---|---|
| ML-WAG | Wagagai Mining | $8.4M |
| ML-2511 | Tororo Cement | $5.4M |
| ML-HIM | Hima Cement | $4.8M |
| ML-2204 | Mubende district | $2.4M |
| ML-SUK | Sukulu Industries | $1.9M |
| Stream | Govt receipts | Co. payments | Variance | Status |
|---|---|---|---|---|
| Mineral royalties | UGX 28.4 bn | UGX 27.9 bn | 0.5 bn (1.7%) | RECONCILED |
| Annual ground rent | UGX 4.2 bn | UGX 3.6 bn | 0.6 bn (16.7%) | VARIANCE |
| Application & renewal fees | UGX 1.8 bn | UGX 1.7 bn | 0.1 bn | RECONCILED |
| Corporate income tax (mining) | UGX 14.6 bn | — | — | UNDISCLOSED |
| Withholding tax | UGX 6.3 bn | UGX 4.1 bn | 2.2 bn (35%) | MAJOR GAP |
Track active, signed and pipeline PSAs. Manage tender rooms, bidder due diligence, fiscal terms, Cabinet approvals.
Single dashboard for boundary breaches, mercury contamination, forest loss, dormancy and EIA renewals.
Per-district score by compliance dimension. Click any cell to drill in.
4.2 ha disturbance 800m east of concession. NDVI −0.34 over 12 days.
Hg 14× WHO threshold downstream of artisanal cluster.
Forest loss inside Kasese protected-area buffer.
Mining contributed 2.2% to GDP in FY 2022/23, up from 0.3% a decade earlier — and is targeted to exceed 7%. With Wagagai gold mine commissioned in August 2025, the Kilembe Cu-Co PSA signed, and a €20M aerial geophysical survey unveiled, Uganda is open for serious mineral investment.
Estimate royalty + tax burden on a Uganda gold project. Defaults shown for a Wagagai-class operation.
| Block | Mineral | Status |
|---|---|---|
| Karamoja K-7 | Lithium | OPEN · 12 Jun |
| Zombo | Gold | OPEN · 28 Jul |
| Aswa belt | Gold | PRE-FEAS |
| Mubende infill | Gold | PIPELINE |
| Karamoja Au-2 | Gold | PIPELINE |
| Sukulu West | REE / P | PIPELINE |
ASM contributes over 90% of Uganda's gold production. This module formalises cooperatives, GPS-pins their sites, KYCs members, and routes them to licensed refineries.
Sentinel-2 NDVI on every active licence with 5-day revisit. Auto-flags boundary breaches, tailings expansion, new haul roads, forest loss inside protected-area buffers.
Kilkenny Mining (ML-2204, Mubende district). 4.2 ha disturbance detected 800m east of the licensed concession boundary. NDVI trajectory dropped −0.34 over a 12-day window. Compliance score fell 81 → 68.
| Date | Concession | Type | Severity |
|---|---|---|---|
| 26 Apr | ML-2204 Mubende Kilkenny Mining |
Boundary breach | CRIT |
| 25 Apr | EL-3318 Rwenzori Glencore Exploration |
61 ha forest loss | CRIT |
| 23 Apr | Buhweju ASM cluster Multiple unlicensed |
Cluster expansion | CRIT |
| 21 Apr | Sukulu ML Sukulu Industries |
Tailings +3.1 ha | HIGH |
| 19 Apr | Kassanda ML Lujinji licensee |
New haul road | HIGH |
| 17 Apr | Wagagai ML Wagagai Mining |
Pit deepening | INFO |
| 14 Apr | Tira ASM Tira Co-op |
NDVI recovery | GOOD |
| 11 Apr | Hima ML Hima Cement |
Quarry advance | INFO |
Mining companies file monthly returns directly. The platform auto-computes royalty against LBMA spot, cross-checks declared tonnage against satellite-estimated extraction, and flags variances against URA export manifests.
| Licence | Holder | Mineral | Tonnes declared | Royalty due | Sat. cross-check | Status | |
|---|---|---|---|---|---|---|---|
| ML-WAG | Wagagai Mining Liaoning Hongda |
Au · refined | 105.2 kg | $0.42M | +1.8% | FILED · 14 Apr | |
| ML-2511 | Tororo Cement | Limestone | 48,200 t | $0.45M | +0.6% | FILED · 09 Apr | |
| ML-HIM | Hima Cement Bharti Enterprises |
Limestone | 41,800 t | $0.39M | −1.2% | FILED · 11 Apr | |
| ML-SUK | Sukulu Industries Guangzhou Dongsong |
Phosphate | 18,400 t | $0.16M | +12.4% | VARIANCE · 12 Apr | |
| ML-MAK | IonicRE Makuutu | REE carbonate | 0 t | $0 | n/a | PRE-PROD | |
| ML-2204 | Kilkenny Mining Mubende |
Au · semi-refined | 3.8 kg | $0.015M | −34% | VARIANCE · 18 Apr | |
| ML-BUH | Buhweju Mining Coop | Au · ASM | 1.2 kg | $0.005M | −42% | VARIANCE · 17 Apr | |
| ML-NMK | Namekhara Vermiculite | Vermiculite | — | — | — | OVERDUE · 8d | |
| ML-MUK | Muko Iron Ore | Iron ore | — | — | — | OVERDUE · 4d | |
| PSA-25-01 | Kilembe Mines Sarrai + Nile Fibreboard |
Cu/Co · PSA | — | — | — | DEWATERING |
Submitted 14 Apr 2026 by E. Mukasa (Production Manager). Auto-validated against LBMA, Sentinel-2 NDVI, and URA export manifest.
NDVI-estimated extraction 34% above declared volume. Combined with the active boundary breach alert on the same licence, this points to under-reporting from off-tenement extraction.
Within tolerance band but trending upward for 3 consecutive months. Recommend grade re-sampling vs declared P₂O₅ percentage.
Coop filing only captures formalised members. Informal operators in same cluster contributing untracked volume. Tira Co-op formalisation model recommended.
Aggregate royalty payable across all licensed operators. Wagagai commissioning (16 Aug 2025) is the inflection point.
Established under the 2022 Mining & Minerals Act, modeled on UNOC.
Holdings in Kilembe (PSA), Wagagai (potential), Makuutu (REE).
Idle excavators, drill rigs, crushers and lab kit listed for hire.
347 pieces of equipment listed. DGSM lists its own analytical equipment for co-op use.
One-page synthesis of the week's compliance, revenue, alerts and tender activity.
1. Mubende boundary breach (ML-2204, Kilkenny Mining) is now the second incident in 90 days. Compliance dropped 81 → 68. Section 47 notice recommended.
2. Karamoja Block K-7 lithium prospectivity now rated HIGH. Tender release 12 Jun with reserve floor $1.2M.
3. Royalty leakage estimate $1.7M this month, concentrated in Busia ASM cluster. Recommend formalisation push via Tira Co-op model.
Every dataset MineralIQ uses is publicly available. Most are free. The platform's job is joining them into decisions today's Ministry can't make. Here is what powers each insight, where it comes from, what it costs, and what it unlocks.
These compound insights require joining 3+ data sources. Each one is a question the Ministry can't currently answer. The platform's whole value is making them computable.
A licence with declared production but no surface change in 24 months. Either legit underground operation, or invoicing for production that isn't happening.
Active extraction visible on satellite, but no licence over that pixel in DGSM cadastre. Pure illegal mining. Currently nobody runs this query systematically anywhere in Uganda.
Declared production × spot price ≠ URA export receipts ≠ Bank of Uganda dollar inflows. The three-way gap is smuggling. Researchers estimate ~95% of Ugandan gold exports historically not mined locally.
Holder's compliance score trajectory over 12 months. Sliding scores predict next regulatory breach within 6 months ~70% of the time. Lets the Ministry call before issuing a Section 47.
Plot dormant blocks vs €20M survey high-prospectivity zones. Where they overlap, the Ministry has a revocation case AND a tender-release pipeline in the same view.
Track gold tonnage from ASM cooperatives → Wagagai refinery (live since Aug 2025). The gap between estimated ASM production and refined output = smuggled volume. Currently invisible.
Compare declared export grade (URA) against satellite-classified ore type. Big mismatch on commodities like Cu/Co tailings suggests under-pricing for export tax avoidance.
Royalty $ ÷ concession km². Exposes who is productively mining vs squatting on prime ground. Drives Section 47 priority and tender block geometry.
Map every Uganda concession to its ultimate beneficial owner via OpenOwnership. Reveals real consolidation pattern hidden behind shell-company licensees.
JRC turbidity downstream of ASM clusters + UNICEF child-labour density + WB Hg-non-compliance = composite exposure index. Drives MoH testing programme priority.
None of these inputs are exotic. Sentinel-2, Sentinel-1, Hansen, JRC water, OSM, VIIRS, EITI, IMF, World Bank — all free, all already there. The intelligence isn't new data. It's the join. Today nobody in Uganda's mining ecosystem brings these layers together — the regulator looks at one feed, the mining company at another, the investor at a third. MineralIQ is that join.
The intelligence isn't new data — it's the fusion. MineralIQ joins 22 public datasets that nobody in Uganda's mining ecosystem currently joins. Today the regulator looks at one feed, the company at another, the investor at a third. This module shows exactly which insight comes from which source, and what each costs.
The single most damning chart in Uganda mining — and it requires three cheap public sources joined together.
A holder's compliance trajectory predicts breach 6 months before it happens.
| Source | Category | Tier | Cost / month |
|---|---|---|---|
| Sentinel-2 · Sentinel-1 | Satellite | Open Copernicus | FREE |
| Hansen Forest · GFW | Satellite | Open | FREE |
| JRC Surface Water | Satellite | Open | FREE |
| VIIRS Night Lights | Satellite | Open NASA/NOAA | FREE |
| PlanetScope (tasking) | Satellite | API tier | $3,000 |
| Google Earth Engine compute | Compute | Commercial tier | $1,200 |
| SRTM · ASTER GDEM | Geological | Open | FREE |
| €20M Aerial Geophysics | Geological | DGSM partnership | FREE |
| Lehmann et al. + UNDP | Geological | Open access | FREE |
| DGSM Cadastre | Government | Public web → API | FREE |
| URA Export Manifests | Government | URA partnership | FREE |
| UBOS + MEMD reports | Government | Open | FREE |
| NEMA EIA database | Government | Public | FREE |
| OSM + GADM + UBOS shapefiles | Government | Open | FREE |
| LBMA + LME prices | Market | Delayed feed | FREE |
| IMF + WB + BoU | Market | Open APIs | FREE |
| ASX/LSE filings · Companies House | Market | Open | FREE |
| EITI Uganda reports | NGO | Open | FREE |
| NRGI Resource Gov. | NGO | Open | FREE |
| WB ASM + Minamata | NGO | Open | FREE |
| Inspector Mobile App | Mobile | Internal build | $1,800 |
| SMS / USSD gateway (MTN/Airtel) | Mobile | Aggregator | $1,500 |
| Hosting · Postgres · Workers | Infra | AWS/GCP | $500 |
The honest framing: the intelligence isn't new data — it's the fusion. Today nobody in Uganda's mining ecosystem joins these layers. The platform turns scattered public signals into Ministry-grade decisions, on a budget that's a rounding error in the Mining Sector Reform line item.